Resin Injection vs Underpinning: Understanding the Right Approach to Settlement

Compare resin injection vs underpinning for ground settlement, slab lifting and ground support. Learn which approach may suit your project.

Resin Injection vs Underpinning for Settlement

When a slab or structure settles, the repair method matters. Ground movement, soil washouts, and inadequate subgrade compaction can cause sunken concrete, uneven load distribution, and structural cracking.

Therefore, selecting the right remediation strategy depends on the root cause, structural loads, subsoil conditions, and engineering requirements. Two common solutions for asset managers, civil engineers, and contractors are resin injection and traditional underpinning.

While both methods address settlement, they serve different purposes. Understanding these engineering differences helps project teams select an appropriate solution while minimising unnecessary disruption.

What Is Resin Injection?

Resin injection is a minimally invasive ground remediation and slab-levelling technique. It involves injecting expanding polyurethane resin into the subgrade or beneath concrete slabs to fill voids, improve ground support, and help restore levels.

As a result, resin injection can address certain settlement issues with less excavation and disruption than traditional methods.

 

Resin Injection: Typical Application Workflow

The general application workflow typically follows these key steps:

  1. Injection Points: Small, discrete holes are drilled through the concrete slab or at designated ground entry points.
  2. Resin Delivery: Specialist equipment injects polyurethane resin components under controlled pressure.
  3. Expansion and Void Filling: The resin expands in a controlled reaction, filling voids and improving contact with surrounding ground materials.
  4. Controlled Lifting: Where specified by engineering design, the expanding resin can provide controlled slab re-levelling and lifting.

As a result, resin injection is commonly used for targeted ground improvement, void filling beneath concrete slabs, and suitable slab-levelling applications where deep foundation modification is not required.

What Is Underpinning?

Traditional underpinning is a structural engineering method used to strengthen, extend, or deepen an existing foundation system. It is typically considered when the existing foundation no longer provides adequate support or when ground conditions require a deeper or more stable load-bearing solution.

Unlike resin injection, underpinning generally involves structural foundation work and may require excavation, temporary support, and detailed engineering design.

Underpinning may be specified when existing footings no longer provide adequate support for structural loads or when loads need to transfer to deeper, more competent soil or bedrock. Common methods include:

  • Mass Concrete Underpinning: Excavating sections beneath existing footings in stages and installing concrete to create a deeper bearing surface.
  • Piling Systems: Installing micropiles, screw piles, or bored piles through weaker strata to transfer structural loads to more competent ground.

Unlike resin injection, underpinning directly modifies or supplements the foundation system. The appropriate method depends on the severity and cause of movement, ground conditions, structural requirements, and engineering assessment.

 
Concrete Settlement and Foundation Cracks
Illustrative image Before: Settlement and Ground Movement - Uneven slabs and foundation cracking caused by ground movement or loss of support.

Resin Injection vs Underpinning: Technical Comparison

The choice between resin injection and underpinning depends on the cause of settlement, ground conditions, structural loads, and project-specific engineering requirements. The table below summarises the key differences:

FactorResin InjectionTraditional Underpinning
Primary PurposeVoid filling, ground improvement and slab re-levellingFoundation strengthening and load transfer
Typical ApplicationsSunken slabs, pavements, subbase voids and localised ground improvementFoundation settlement, inadequate bearing capacity and deeper ground instability
ExcavationTypically limited to small injection penetrationsGenerally requires excavation or foundation access
Site AccessCan suit restricted-access areas, subject to equipment requirementsMay require greater access for excavation or piling equipment
Void FillingExpanding resin can fill accessible sub-slab voidsPrimarily focused on foundation support rather than shallow void filling
Slab LiftingControlled resin expansion can re-level suitable slabsMay use jacking in conjunction with new structural supports
Deep Foundation SupportGenerally suited to targeted injection depths and ground improvementCan transfer loads to deeper, competent strata using piles or other systems
Site DisruptionTypically less excavation and surface disruptionGenerally involves greater excavation and construction activity
Engineering AssessmentRequires assessment of ground conditions, voids, slab integrity and injection suitabilityRequires structural and geotechnical assessment and engineered design
Suitable ConditionsLocalised settlement, voids and shallow ground-support issuesDeeper foundation problems or situations requiring additional structural support

Transition sentence:
Ultimately, resin injection and underpinning address different ground and foundation conditions. The appropriate solution should be determined through site investigation and engineering assessment rather than settlement symptoms alone.

Illustrative Polyurethane resin injection fills accessible ground voids, improves subgrade support, and can help restore slab levels where appropriate.

Polyurethane Solutions: PURL-SJ80

Liquimix offers polyurethane systems for targeted ground improvement, void filling and concrete remediation applications.

PURL-SJ80 is a polyurethane resin system used for suitable slab lifting, void filling and subgrade improvement applications.

  • Primary Role: Suitable for controlled resin injection beneath concrete slabs where void filling, ground improvement or re-levelling is required.
  • Performance: The expanding resin can fill accessible voids and improve contact between the slab and supporting ground.
  • Applications: Depending on project conditions and engineering requirements, applications may include concrete slabs, pavements and hardstand areas.

Polyurethane Solutions: PURL-SJ120

PURL-SJ120 is a polyurethane injection system intended for applications where the specified material properties meet the project requirements.

  • Primary Role: Used for suitable ground improvement, void filling and slab remediation applications.
  • Performance: Its cured properties should be assessed against the required load, density and compressive-strength criteria.
  • Applications: Selection should be based on the project design, substrate conditions and applicable engineering requirements.

POLYURETHANE SOLUTIONS: PURL-SJ40

PURL-SJ40 is a polyurethane resin system for suitable slab lifting, void filling and ground improvement applications.

  • Primary Role: Suitable for resin injection applications where lower-density foam performance is appropriate.
  • Applications: May be considered for suitable void filling, slab remediation and ground improvement projects, subject to project requirements.

POLYURETHANE SOLUTIONS: PURL-SJ60

PURL-SJ60 is a polyurethane resin system for suitable slab lifting, void filling and ground improvement applications.

  • Primary Role: Suitable for resin injection applications where the specified material properties meet project requirements.
  • Applications: May be considered for suitable void filling, slab remediation and ground improvement projects, subject to project requirements.

Product selection should always follow the current Liquimix technical documentation and project-specific engineering assessment.

When Should Resin Injection Be Considered?

Subject to site investigation and engineering assessment, resin injection may be considered for:

  • Sunken or uneven concrete slabs
  • Voids beneath concrete caused by erosion or loss of subgrade support
  • Localised ground settlement
  • Suitable pavement and hardstand remediation
  • Slab re-levelling where the substrate and structure are suitable
  • Targeted ground improvement and void filling

Important: The cause of settlement should be established before selecting a remediation method. Active leaks, drainage problems, deep foundation movement or other underlying causes should be addressed as part of the overall repair strategy.

When May Underpinning Be More Appropriate?

Underpinning may be considered where the existing foundation requires additional structural support or where loads need to transfer to deeper, more competent ground.

This may include:

  • Deep-seated foundation movement
  • Inadequate founding conditions at existing footing level
  • Significant structural loading requirements
  • Foundation modifications requiring increased depth or bearing capacity
  • Projects where engineered piles or other deep foundation systems are specified

Resin Injection vs Underpinning: Key Considerations

Before selecting a remediation method, consider:

  • Cause of settlement: What is causing the movement?
  • Ground conditions: What are the soil profile, moisture conditions and bearing characteristics?
  • Foundation type: What foundation or slab system supports the structure?
  • Structural loading: What loads act on the affected area?
  • Extent of movement: Is the settlement localised, differential or deep-seated?
  • Site access: What equipment and access conditions are available?
  • Existing services: Are utilities or pipework located within the work area?
  • Drainage and water: Are leaks or drainage issues contributing to settlement?
  • Project specifications: What performance requirements apply?
  • Engineering assessment: Has the proposed remediation been reviewed by the relevant qualified engineer?

Related Liquimix Applications

Slab Lifting / Concrete Injection and Levelling

Resin injection can be used for suitable concrete re-levelling and void-filling applications. Targeted injection may help restore slab levels and improve support where site and engineering conditions permit.

Ground Improvement & Void Filling – PURL-GP42

PURL-GP42 is used for ground improvement and void-filling applications. The appropriate product and installation method should be selected according to the cavity, substrate conditions and project requirements.

Illustrative comparison of resin injection and traditional underpinning for addressing ground settlement and structural support.

Contact Liquimix Technical Support

Need help selecting the right resin injection system? Contact the Liquimix technical team to discuss your application, project requirements, and suitable product options.

Related Applications

Related News

Key Takeaways Liquimix supplies closed-cell polyurethane spray foam systems in Australia, plus the Graco equipment to apply them. We also offer equipment hire and workshop servicing. Closed-cell foam is the usual choice for cold storage and industrial pipe insulation because it’s rigid and moisture-resistant. It also insulates more per millimetre

Key Takeaways A sunken concrete slab can be lifted and levelled without removal by injecting expanding polyurethane foam through small holes. Foam jacking is lighter and less invasive than mudjacking, and it reacts within seconds. Liquimix manufactures slab lifting foam in Australia and supplies it to professional applicators. Sunken concrete

Key Takeaways To stop water leaking through cracks in a basement car park, inject the cracks with a hydrophilic polyurethane resin. The CrackShot 150, for example, reacts with water to create the perfect seal, even while it’s still leaking. Use epoxy injection for dry, structural cracks instead. The right choice

Key Takeaways The best waterproof coating for a flat concrete roof is a UV-stable, liquid-applied membrane, typically polyurethane or a polyurea hybrid. It forms a seamless layer with no joints, preventing leaks. Trafficable systems (pedestrian-friendly surfaces for walking) suit rooftop terraces, and lifespan depends on UV exposure, membrane thickness, ponding